IGA Umina Beach
+ DETAILS
Scope of work
• Installation of lighting throughout inclusive of suspended linear track lights, functional deli and back-of-house lighting, LED lighting around perimeter display boards and grid ceiling led panels.
• Installation of power and data throughout with the design of a power plan to balance load across the store
• Supply of power for all LED signage throughout and external store sign
• AV system throughout inclusive of hanging pendant speakers, recessed speakers and PA system with back-of-house volume control and audio inputs.
• Upgrade and installation of custom-made new 400A Main distribution board to separately control general lighting & power, mechanical and refrigeration.
• Installation and design of new Tenant distribution board.
• Installation of 160A 3-phase supply from MSB to refrigeration board on roof deck.
• Installation of kitchen and deli appliances throughout
• Installation of a new comms rack in the back office to suit clients IT needs.
• Post-completion power logging and energy study of the store
Client
Highland Building Group
Metcash Trading Ltd
Timeline
12 weeks
Location
Ocean Beach Road, Umina Beach
Size
8428 sqm









Other Commercial projects

+ Commercial
Caterpillar Club

+ Commercial
IGA Milsons Point
